We inspected the roof to have multiple buildup roof over wood deck with no insulation. We recommend a roof replacement. We would address the walls on the organ roof as well as the coupling on the walls.
We inspected the current condition of the roof to be 2 1/2 inches thick. TPO roof is rubber over 1/2 perlite insulation with multiple buildup roof over wood deck with no insulation.
Go To Pin
2
Organ roof walls to be covered
We will cover the walls of the organ roof portion with TPO.
Go To Pin
3
Terminate the all with Drip edge.
We will install a drip edge on parapet walls using tape and drip edge to prevent the wind from causing any lifting of the TPO.
Go To Pin
4
Bad Roof Deck Replacement
We inspected 2 soft places. We can use thermal imaging prior to tearing off to determine if there is moisture present.
Go To Pin
5
Install new TPO Roof
We will remove the top lay and perlite insulation and roof over with 60ml TPO mechanically fastened.