During Construction Of House

  1. 1
    Rotten Wood

    The home had some rotten wood that had to be replaced. We replaced 3 sheets of OSB.

    This is a picture of a section of wood at the ridge that is getting replaced This is a picture of a section of wood that is getting replaced

    Go To Pin
  2. 2
    Roofing Components Installed

    The whole roof is getting synthetic underlayment while the valleys are getting ice and water shield. All the edges of the roof will be getting drip edge.

    This is a picture of synthetic underlayment being laid down on a roof This is a picture of ice and water shield being laid down in the valleys

    Go To Pin