Search
Close this search box.

During Construction

  1. 1
    Roof Torn Off

    We tore the roof down to the wood. Upon inspection, we found some rotted wood near the valley and at the ridge so the OSB was replaced in those areas.

    This is a picture of a roof that has had all the shingles torn off This is a picture of wood that was replaced at the bottom of a valley

    Go To Pin
  2. 2
    Protection Is Key

    Once the rotted wood was replaced we laid down the ice and water shield and synthetic underlayment to protect the roof from any leaks.

    This is a picture of synthetic underlayement and ice and water shield on a roof This is a picture of synthetic underlayment and ice and water shield on a roof This is a picture of brown shingles being installed on a roof

    Go To Pin

Visual Marketing By Lead Symphony – Patent Pending