Search
Close this search box.

Call Us For A Free Estimate

758 Like Unlike

This was a roof inspection in Louisville, TN, at an apartment complex considering doing a service agreement with Litespeed Construction.

Service Agreement Inspection

  1. 1
    Gutters need to be cleaned out as there are trees lined along all the buildings

    This is a view of the roof and gutters with lots of debris and leaves. 

    Gutters need to be cleaned out

    Go To Pin
  2. 2
    Pipe Boots are cracked and need to be resealed

    Pipe boots are cracked.

    Pipe boots need to be recalled

    Go To Pin
  3. 3
    Nails need to be hammered down. Could be causing leaks.

    Nails need to be hammered down.  It could be the cause of leaks.

    Nails need to be hammered down

    Go To Pin
  4. 4
    Roof inspection video

     

    Go To Pin
  5. 5
    Exposed nails can be causing leaks.

    We will need to re-seal the nails. 

    Exposed nails in shingles

    Go To Pin

Roof Tune Up Done On Building 1

  1. 1
    Rotten Wood That Should Be Replaced At Pipe

    This area where the pipe is coming out has rotten wood underneath. It is very soft and it is recommended that this area be replaced. Nail holes for this pipe boot were sealed to stop the leaks in the apartment.

    This is a picture of rotten wood at the pipe

    Go To Pin
  2. 2
    Nails Were Pulled Out And Sealed

    All popped out nails on this roof were pulled out and the holes were sealed to stop any possible leaks.

    This is a picture of a nail that was sticking out of the shingles.

    Go To Pin
  3. 3
    All Stove Pipes Sealed

    All of the stove pipes on this building were sealed to prevent any leaks.

    This is a picture of a stove pipe that was completely sealed.

    Go To Pin
  4. 4
    All Exhaust Pipes Sealed

    All of the exhaust pipes were sealed to prevent leaks. Some pipes required the installation of pipe collars to completely seal up.

    This is a picture of a pipe collar on an exhaust pipe.

    Go To Pin

Roof Tune Up On Building 15

  1. 1
    Gutters Were Cleaned Out

    All of the gutters at this building were completely cleaned out.

    This is a picture of gutters that were cleaned out

    Go To Pin
  2. 2
    All Exhaust Pipes Sealed

    All of the exhaust pipes at this building were sealed to prevent leaks.

    This is a picture of an exhaust pipe that was sealed

    Go To Pin
  3. 3
    All Stove Pipes Sealed

    All of the stove pipes were completely sealed to prevent leaks inside of the apartments.

    This is a picture of a stove pipe that was sealed.

    Go To Pin

Call Us – (865) 297-3286

Visual Marketing By Lead Symphony

Job Location

This area is an approximation and does not represent the exact location