The rotten boards were replaced before the roof was covered with synthetic underlayment.
The ridge was cut back to 2 inches on each side to give the roof more room to breathe. Then a new ridge vent was installed.
The new roof that was installed was with Certainteed Charcoal shingles. The roof was installed with starter shingles, ridge vent, and new pipe boots.
Visual Marketing By Lead Symphony – Patent Pending