During Construction

  1. 1
    All Wood Was Inspected

    After the roof tear off, all of the wood was inspected to make sure that it was good to shingle over. All of the wood was good, there was no rotten wood and we were able to do new shingles.

    This is a picture of a garage with only the wood showing and no shingles

    Go To Pin
  2. 2
    Synthetic Underlayment And Ice And Water Shield Added

    Synthetic underlayment and ice and water shield were added to the roof after the tear off. Both of these were added as extra layers of protection to prevent leaks.

    this is a picture of ice and water shield being added to a valley this is a picture of synthetic underlayment  under new shingles

    Go To Pin